給排水管的支吊架,有的施工人員為了節(jié)省費用,選擇的型鋼偏小,布置的數(shù)量沒達到要求,或者布置的位置不合理。解決辦法:在橫管三通和彎頭附近的地方一般要設置支吊架此處一般受水流沖擊力大些。另外,ppr管件,對于upvc管而言,橫管吊架設置的間距和它的dn直徑相同,比如dn40的管吊架間距就為40cm。
for the supports&hangers of water supply&drainage pipes, some workers choose small parts steel in order to save costs,ppr管件管材, the number of layout does not meet the requirements,/the location of layout is unreasonable. solution: the support&hanger should be set near the cross pipe tee&elbow (the impact force of water flow is greater here). in addition, for upvc pipe, the spacing of horizontal pipe hanger is the same as its dn diameter, for example, the spacing of dn40 pipe hanger is 40cm.
ppr 管材與 ppr 塑件連接,是常見的連接方式,通常大家聽到的,ppr 管材熱熔連接,就是說的這種方式,我們經(jīng)常見到的,直接連接,大多采用 ppr 管和直接塑件進行熱熔連接,仙桃ppr管件,ppr 管材,與 ppr 嵌件伸縮節(jié),可直接進行熱熔承插連接。
ppr pipe&ppr plastic parts connection, is a common way of connection, usually you hear, ppr pipe hot-melt connection, that is to say, this way, we often see, direct connection, mostly using ppr pipe&direct plastic parts for hot-melt connection, ppr pipe,&ppr insert expansion joint, can be directly hot-melt socket connection.
uk gafloon pipe group ltd 提醒您水電安裝預埋管線注意事項給排水部分
在套管預留預埋階段容易出現(xiàn)漏埋,磚墻的話以后可以開洞。如果是剪力墻、或者重要梁的部位是非常麻煩的解決的辦法,必須逐個核實套管的預留個數(shù)和預留位置。
uk gafloon pipe group ltd reminds you of the water supply&drainage part of water&electricity installation
in the stage of casing reservation&embedment, it is easy to be missed. if the brick wall is used, the hole can be opened later. if it is the shear wall/the important beam, it is a very troublesome solution. the number of the sleeve must be verified one by one.