ppr管與其他塑料管材連接
ppr管材與其他塑料管材連接的情況,不是很多,ppr管材代理,當(dāng)ppr 管材與 pert 管材連接時(shí),ppr 管材連接 ppr轉(zhuǎn)pert轉(zhuǎn)換接頭的ppr一側(cè),ppr 管材與 pb 管材連接時(shí),ppr 管材連接 ppr轉(zhuǎn)pb 轉(zhuǎn)換接頭的ppr一側(cè)。
when ppr pipe is connected with pert pipe,浙江ppr管材, ppr pipe is connected with ppr side of ppr to pert adapter. when ppr pipe is connected with pb pipe, ppr pipe is connected with ppr side of ppr to pb adapter.
水閥
水路改造時(shí),記得家里要安裝一個(gè)總水閥,用來(lái)開啟和關(guān)閉水流。這樣家中發(fā)生漏水,或者需要更換水閥的時(shí)候,不用跑到樓下關(guān)水。水閥可以安裝在水槽下方,不占空間。水閥價(jià)格比較貴,如果,ppr管材廠家,你不提醒,工人不一定給你裝,等瓷磚貼好再發(fā)現(xiàn)就遲了。
water valvewhen rebuilding waterways, remember to install a main water valve at home to open&close the water flow. in this way, when there is leakage in the house/the tap needs to be replaced, there is no need to run downstairs to turn off the water. the water valve can be installed under the water tank without occupying space. the price of water valve is more expensive. if you dont remind, the workers dont have to install it for you. its too late to find it after the tiles are pasted.
做排水管時(shí)注意坡度:尤其是空調(diào)冷凝排水管,如果管子比較長(zhǎng),施工不好容易妨礙排水,導(dǎo)致返水至冷凝水盤漏水。解決辦法:按照設(shè)計(jì)圖紙標(biāo)示的坡度,定好點(diǎn),放好線,ppr管材管件,按照相應(yīng)的間距,下料做好吊支架。
pay attention to the slope when --- the drainage pipe: espe---lly the air conditioning condensate drainage pipe, if the pipe is relatively long&the quality is not good, it is easy to hinder the drainage, resulting in the leakage of return water to the condensate pan. solution: according to the slope marked on the design drawings, set a good point, set a good line, according to the corresponding spacing, do a good job of lifting support.